Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
亚都
jdb电子
求魔官网
冰球突破豪华版
优酷体育频道
十博体育
Haobo-Sports-billing@callaosalvajecommunitychurch.com
瑞聚股份
CQ9-electron-contact@gotya-app.com
Crown-betting-careers@thesexyspinster.com
黑龙江盛京皮肤病医院
广东文理职业学院
查快递
沪鸽口腔
街拍博客
前程人力
渭城在线
商都家居
河南师大附中
远图互联